Dretzka Park Parking and Stormwater Improvements (Design)

Dretzka New Parking Lot and Storm System

 

New Parking Lot Coming To Dretzka Golf Course!

Scope of Work: 

The scope of work includes planning and design for replacement of the Dretzka Golf Clubhouse parking lot. Storm water best management practices, green infrastructure, natural areas restoration and management shall be incorporated where applicable. With respect to Sustainability and Energy Efficiency, Lighting will be replaced with LED fixtures. Asphaltic concrete mixes used for surface course and binder course may contain salvaged or reclaimed asphaltic material. Crushed gravel base course may include crushed stone, crushed gravel, crushed concrete, reclaimed asphaltic pavement, reprocessed material or blended material. 

Construction Time: 2021-2024