Washington Park Playground Replacement

Updated September 21, 2021

Project Summary 

NOTE: Due to COVID related issues with material availability and manufacturing lead times for play equipment, playground improvement start-times have been pushed back. Please expect to see these improvements along with others resurface in Spring of 2022. 

In the meantime, we invite you to provide your input on what you'd like this park to look like! Click the following link: Playground New Look Survey.

This playground located south of W. Highland Blvd. (just off of the Hwy 175 exit ramp) in Washington Park was installed in 2000 and is one of the oldest playgrounds in the parks system. The new playground system will include ADA accessible features and will upgrade to a mixture of "pour-in-place" surfacing (soft, rubberized surface) and wood fiber. This is a safer and cleaner option than sand surfacing. 

Current Site Conditions

Proposed Concept

This image is a draft design concept. Final design features are pending. 

Budget

  • Total budget is $291,984 (approved in the  2020 Milwaukee County Capital Budget)
  • Budget includes design, removal of current playground, installation of new playground, and corresponding site improvements such as new benches.

Timeline 

  • Design is underway for this playground. Stay tuned for a "playground pop-up" to see designs and give feedback (date TBD). 
  • Construction is expected to take place in summer 2021. The playground will be closed during construction. Exact construction timeline is currently unknown. 
  • Note: timelines subject to change.

Learn about additional playground projects taking place across Milwaukee County Parks, including resurfacing at the Lloyd Street Playground in Washington Park!